Will the shipment be dispatched before the client approves the COA?
No. Once the laboratory issues the electronic COA, the report is shared with the client first. Under factory-site inspection the balance is paid after the client confirms the quality is acceptable; under warehouse-intake inspection dispatch is authorised after the client confirms all parameters meet the agreed requirements. Only then is the batch routed into the cross-border cold chain, such as DDP air freight or a sea-air combination.
These answers are general industry information, not regulatory, medical or legal advice. Regulatory status, import rules and clinical suitability must be verified for the specific product, jurisdiction and intended use.